Kirui v Westland Pride Limited

Kirui v Westland Pride Limited (Environment & Land Case 184 of 2013) [2022] KEELC 15034 (KLR) (24 November 2022) (Judgment) Neutral citation: [2022] KEELC 15034 (KLR) REPUBLIC OF KENYA IN THE ENVIRONMENT AND LAND COURT AT NAIROBI ENVIRONMENT & LAND CASE 184 OF 2013 MD MWANGI, J NOVEMBER 24, 2022 BETWEEN STANLEY KIRUI ........................................................................................ PLAINTIFF AND WESTLAND PRIDE LIMITED ............................................................ DEFENDANT JUDGMENT Background 1. The plainti brought this suit by way of a plaint dated February 6, 2013 which was amended on the February 14, 2020 pursuant to leave of court granted on the February 12, 2020. In his amended plaint, the plainti averred that through 2 sale agreements both dated May 25, 2009 between himself and the defendant, the defendant agreed to sell to him by way of lease, two (2) apartments being D9 and D10 (hereinafter referred to as the “suit property”) at a consideration of Ksh 17,600,000/=. The plainti aver that pursuant to the sale agreements aforesaid, on or about April 14, 2009, he paid to the defendant a sum of Ksh 3,520,000/= being 20% deposit in respect of the two apartments. 2. The plainti states that it was mutually agreed that the completion date was December 31, 2009 or within 30 days of the issuance of the certicate of occupation by Nairobi City Council and receipt of the clearance certicate. That time was of essence in regard to the completion. He argued that despite the clear terms and conditions of the said sale agreements, construction of the apartments stalled from April, 2009 till sometimes in March, 2011 thereby occasioning delay in the completion of the sale. The defendant however assured him that the project would be completed and they adjusted the completion date to December 31, 2011. 3. He further averred that on the May 18, 2012, despite not completing its side of the bargain, the defendant wrote to him demanding remittance of Ksh 1,760,000 for each apartment as further payment of the purchase price in accordance with the terms and conditions of the sale agreements. The plainti requested the defendant for its Bank details to eect the payment but to no avail. https://new.kenyalaw.org/akn/ke/judgment/keelc/2022/15034/eng@2022-11-24 1

page 1 of 8

4. That to his surprise, the defendant informed him sometime in 2012 that the suit property had been sold to a third party way back in July 2010. The basis of the sale to the third party was allegedly because the plainti had requested for a refund of his deposit paid to the defendant through a letter dated July 21, 2010. The plainti states that he abandoned his demand for the deposit paid after the defendant reassured him that the construction would be continued despite having stalled. 5. The plainti averred that the defendant later refunded him the said deposit of Ksh 3,520,000/= or the January 31, 2014 despite his willingness to perform his outstanding obligations under the sale agreements. 6. The plainti claims that he suered loss of business opportunity and investment due to the defendant’s refusal to complete the contract and proceeding to sell the apartments to a third party without reference to him. He arms that the defendant’s conduct was wrongful, illegal and unlawful and amounted to breach of contract. 7. The plainti averred that he was at all times ready, able and willing to perform his contractual obligations under the sale agreements. 8. The plainti averred that he had suered great loss and damage including loss of interest on the said deposit of Ksh 3,520,000/= at the rate of 14% from April 14, 2009 to January 31, 2014 when the same was refunded to him. 9. The plainti therefore sought judgement against the defendant for; a. Damages for breach of contract the quantum of which to be determined by this honourable court together with interest thereon. b. Loss of interest of Ksh 2,378, 941 with interest at court rates. c. Costs of this suit and interest at court rates. Defendant’s Statement of Defence 10. The defendant opposed the plainti’s claim through the Statement of Defence dated April 12, 2013 later amended on the February 24, 2020. The defendant conrmed that it entered into two sale agreements with the plainti for the sale of its two apartments; Number D9 and D10 erected on Nairobi LR No 5/155. That indeed the plainti paid a 20% deposit on the purchase price of each unit. The defendant however denied all the particulars of alleged illegality and breach of contract against it. 11. The defendant armed that the sale price for each unit was Ksh 8,800,000/= and a 20% deposit equivalent of Ksh 1,760,000/= was payable upon execution of the agreement for sale for each apartment. A further sum of Kshs 1,760,000/= was also to be paid before the last day of the sixth month after execution of the sale agreements in respect of each apartment. The balance being 60% of the purchase price was payable upon completion. However, the plainti in this case only paid the initial deposit on the sale price (20% deposit) and never paid anything else contrary to the terms of the agreements. The plainti did not honour his part of the contract. The defendant at paragraph 5 of the amended statement of defence tabulated the breaches by the plainti. 12. The defendant averred that before the completion date, the plainti wrote to the defendant citing delays in completing the transaction, rescinded the sale agreements and informed the defendant that he was no longer interested in the transaction. He demanded a refund of his deposit. The defendant responded to the said letter and requested the plainti to furnish it with his bank account details so https://new.kenyalaw.org/akn/ke/judgment/keelc/2022/15034/eng@2022-11-24 2

page 2 of 8

as to eect the refund but the plainti did not avail the details. The defendant further informed the plainti that the suit premises had long been sold to a third party. 13. The defendant further contends that although it was entitled to retain the deposit paid under the Law Society of Kenya Conditions of Sale (1989), it forfeited the deposit and refunded it to the plainti on January 31, 2014. The plainti is therefore estopped from claiming damages as a result of his own actions in breaching the terms of the sale agreements and demanding his deposit back. That the suit is mischievous, frivolous and discloses no reasonable cause of action and should therefore be dismissed with costs. Evidence Adduced 14. The case proceeded to hearing and parties testied in support of their respective positions. Evidence Adduced By The Plainti 15. At the trial, Stanley Kirui (PW1) adopted his witness statement dated February 6, 2013 and the further witness statement dated February 24, 2022 as his evidence in-chief. He further relied on the documents in the plainti’s bundle of documents in support of the his case. The bundles of documents are dated February 6, 2013 and a further list of documents dated February 24, 2022. 16. It was the plainti’s evidence that he paid a sum of Ksh 3,520,000/= on the April 14, 2009 being the deposit in respect of the 2 apartments he was to buy from the defendant. This was equivalent of 20% of the purchase price for each unit. That subject to clause 10 of the agreements, he was supposed to be given a 21 days’ notice before the sale was rescinded. 17. That due to frustration by the defendant, he wrote a letter through his Advocate indicating that he was not intending to continue with the transaction. That there was no response from the defendant until in 2012 when the defendant wrote to him demanding a further instalment of Ksh 1,760,000/=. He sought for the plainti’s account to enable him eect the payment but to no avail. At that time, construction was still ongoing though beyond the completion date. 18. The defendant later on wrote to him informing him that the letter demanding a further deposit was sent to him erroneously. He was further informed that the apartments had been sold to a third party after the defendant received his letter of July 21, 2010 rescinding the contract and demanding his deposit. The plainti however maintained that he had not received any response to his letter of July 21, 2010, he thought that the defendant had not acted on it. He had not been refunded the deposit either despite having demanded the same. 19. He testied that he was later refunded his deposit through his advocate who acknowledged receipt and issued a receipt to that eect. He claims for loss of interest of Ksh 2,378,941/- being the interest he would have earned if he had deposited the money in a xed deposit account. He further claims for breach of contract and prays for a sum of Ksh 18.4 Million for the two apartments being the equivalent current market value. The gure was based on the sale price of a similar property that the plainti had sold in an upmarket location in Nairobi. 20. In cross-examination by the Advocate for the defendant, the plainti conrmed that the Letter dated July 21, 2010 (PE 9) from his Advocate demanded a refund of the deposit paid. He also conrmed that the Letter dated June 8, 2012 from the defendant indicated that the demand for a further deposit was erroneous. Further, the letter informed him that the defendant had sold the 2 apartments to a third party. The said letter also requested him for his Bank details to refund the deposit. https://new.kenyalaw.org/akn/ke/judgment/keelc/2022/15034/eng@2022-11-24 3

page 3 of 8

21. He agreed that he had not attached a valuation report of the suit property(s). The interest he was claiming was from April 14, 2009 to January 31, 2014. Defendant’s Case 22. Daniel Ojijo Agili, the Managing Director of the defendant Company testied as DW 1. He adopted his witness statement dated February 25, 2020 as his evidence in-chief. He also relied on the documents listed on the defendant’s list of documents dated February 25, 2020 in support of the defendant’s case. 23. He testied that the plainti demanded a refund of his deposit vide the letter of July 21, 2010. 24. He further stated that the plainti never fullled the terms of agreements. The plainti actually rescinded the contracts and demanded a refund of the deposit. The plainti further, never gave his bank account details to enable the defendant refund him the deposit as requested. 25. During cross-examination, DW1 stated that the completion date was December 31, 2009 or within 30 days of issuance of the certicate of occupation and receipt of the clearance certicate whichever was later. Time was of essence. Further, that as per clause 10, the vendor was to give a 21 days’ notice in the event the purchaser defaulted or 30 days’ notice in case the vendor defaulted. In case of a refund, the same would be with interest at 1.5 % per month computed from the date of service of rescission notice. That there was no rescission as per clause 11 of the agreement. He blamed the plainti for the failure of the transaction. Court’s Directions 26. Upon the conclusion of the hearing, the court directed parties to le written submissions. Both parties complied. The plainti’s submissions are dated July 4, 2022 whereas the defendant’s submission are dated July 25, 2022. The court has had occasion to read the submissions of both parties with the attached decided cases. Issues for Determination 27. Considering the pleadings led in this case, the evidence adduced and the respective submissions of the parties, the court is of the view that the issues for determination in this case are; A. Who breached the agreements? B. Whether the plainti is entitled to the reliefs sought. C. Who should bear the costs of the suit? Analysis and Determination A. Who breached the agreements? 28. I have considered all the pleadings and the evidence presented before this court. It is not in dispute that the two litigants herein had entered into two (2) sale agreements for the sale of two (2) Apartments being D9 and D10 (the “suit property”) at a consideration of Ksh 17,600,000/=. The plainti paid to the defendant a sum of Ksh 3,520,000/= being 20% deposit of the purchase price in respect of the two apartments. 29. It is also not in dispute that the transaction was not successfully completed as contemplated in the agreements. The deposit paid by the plainti to the defendant was refunded. The balance of the purchase price was never paid. https://new.kenyalaw.org/akn/ke/judgment/keelc/2022/15034/eng@2022-11-24 4

page 4 of 8

30. Each party blames the other for the failure to complete the transaction. The plainti blames the defendant for unilaterally rescinding the contracts without any reference and/or notice to him. He faults the defendant for purporting to sell and subsequently selling the two apartments to a third party while their agreements were still in force and at an increased market value despite being the cause of the delay. 31. The defendant on the other hand blames the plainti for failing to pay the purchase price as agreed and rescinding the Agreement vide it letter dated July 21, 2010 and demanding a refund of the purchase price. The plainti contends that it was the delay in the construction, that prompted him to express his intention terminating the engagement with the defendant. 32. The Black’s Law Dictionary, 9th Edition, at page 213 denes a breach of contract as follows; “ a violation of a contractual obligation by failing to perform one’s own promise, by repudiating, or by interfering with another parties performance. A breach may be one by non-performance or by repudiation or both. Every breach gives rise to a claim for damages and may give rise to other remedies. Even if the injured party sustains no pecuniary loss or unable to show such loss with sucient certainty he has at least a claim for nominal damages.” 33. In the case of Gatobu M’Ibuutu Karatho vs Christopher Muriithi Kubai [2014] eKLR the court cited with approval the Ugandan case of Nakana Trading Co Ltd V Coffee Marketing Board 1990 1994 EA 448, where the High court in Kampala held that; “ In contract, a breach occurs when one or both parties fail to fulll the obligations imposed by the terms. Since the contract between the parties was reduced into writing, the duty of the court is to look at the document itself and determine whether it applies to existing facts. No evidence can be adduced to vary the terms of the contract if the language is plain and unambiguous….” 34. In the Court of Appeal case of National Bank of Kenya vs Pipe plastic Samkolit (k) Ltd & Another (2001) eKLR, it was held that; “ A court of law cannot re-write a contract between the parties. The parties are bound by the terms of their contract unless coercion, fraud or undue inuence are pleaded and proved.” 35. Likewise, in the instant matter, this court will not in any way strive to re-write the contract for the parties; rather, the court’s responsibility is only to analyze the terms of the contract against the evidence adduced to determine the issues accordingly. 36. I have perused the agreements of May 25, 2009. The sale price for each unit as provided in clause 5 was Ksh 8,800,000/= and 20% deposit of Ksh 1,760,000/= on the purchase price of each unit was payable as both parties have conrmed. A further sum of Kshs 1,760,000/= was also to be paid in respect of each unit before the last day of the sixth month after execution of the sale agreements. The balance of 60% of the purchase price was payable upon completion. 37. Although the plainti faults the defendant for delay in performing its part of the bargain, it not in dispute that he did not pay the second instalment of 20% as agreed in respect of each unit before the last day of the sixth month after execution of the sale agreements. He had not honoured his contractual obligations. https://new.kenyalaw.org/akn/ke/judgment/keelc/2022/15034/eng@2022-11-24 5

page 5 of 8

38. The completion date in respect of both agreements was December 31, 2009 or within 30 days of the issuance of the Certicate of Occupation by Nairobi City Council and receipt of the clearance certicate whichever was later. The plainti acknowledged writing to the defendant the plainti conrmed that the letter dated July 21, 2010 (‘PE 9’) notifying the defendant that he was no longer interested in continuing with the transaction and demanding a refund of the deposit paid on the pretext that the defendant had delayed completing the construction beyond the completion date. The plainti had denitely misinterpreted the completion clauses of the agreements - ‘December 31, 2009 or within 30 days of the issuance of the certicate of occupation by Nairobi City Council and receipt of the clearance certicate whichever was later’. The plainti’s interpretation was that since the defendant had not completed the construction by December 31, 2009, it was default. That was clearly a misinterpretation of the clause. 39. The Black’s Law Dictionary, Ninth Edition denes “rescission” as, “ A party’s unilateral unmaking of a contract, for a legally sucient reason such as the other party’s material breach or a judgment rescinding the contract……Rescission is generally available as a remedy or defence for a non-defaulting party and is accompanied by restitution of any partial performance, thus restoring the parties to their pre - contractual positions.” 40. It is evident that the plainti failed to honor his contractual obligations, and the defendant was at liberty to rescind the agreement, by notifying or communicating such rescission to the plainti. However, before the defendant could do so, the plainti rescinded the Agreement vide the letter dated July 21, 2010 (‘PE 9’) notifying the defendant that he was no longer interested in continuing with the transaction and demanding a refund of the deposit paid. 41. I need to point out that the plainti’s letter of July 21, 2010 conrmed the rescission notice given on February 8, 2010 in accordance with the provision of condition 11 of the agreements providing for rescission of the sale. The plainti had in the earlier letter explicitly rescinded the sale. His letter stated that, “ In the circumstances and as per the provisions of the said condition, we, on behalf of our client, give your client 30 days notice from the date of service of this letter upon yourselves that if it does not complete the construction of the two apartments and also the sale herein, the sale shall forthwith stand terminated whereupon your client shall be liable to refund to our client the deposit of Kshs 3,520,000/= aforesaid together with interest thereon and without any deduction whatsoever.” 42. In the letter of July 21, 2010, the plainti through his Advocate wrote and stated that; “ In the circumstances and in terms of our letter to you of February 8, 2010, we hereby request your client to remit to us the sum of Kshs 3,520,000/- being refund of the deposit with interest within the next 7 days as our client no longer interested in the two properties any more for the said reason.” 43. The said deposit was eventually refunded as demanded without any deductions. 44. The court’s nding in respect of the rst issue therefore is that it is the plainti who breached the agreements. https://new.kenyalaw.org/akn/ke/judgment/keelc/2022/15034/eng@2022-11-24 6

page 6 of 8

B. Whether the plainti is entitled to the reliefs sought. 45. The plainti’s claims for:a. Damages for breach of contract the quantum of which to be determined by this Honourable Court together with interest thereon. b. Loss of interest of Ksh 2,378, 941 with interest at court rates. c. Costs of this suit and interest at court rates. 46. The court’s nding on the rst issue above, settles the issue of reliefs. The plainti being the party at fault cannot be entitled to the reliefs sought against the defendant. 47. The plainti in his plaint had prayed for damages for breach of contract but in his submissions submitted on loss of bargain amounting to a whooping sum of Kshs 18.4 million. The plainti claimed for loss of bargain was in spite of the fact that he acknowledged that he was refunded the deposit he had paid to the defendant. 48. The Court of Appeal decision in Gami Properties Limited vs National Social Security Fund Board of Trustees & Chief Land Registrar [2021] eKLR explains what loss of bargain in the following terms; “ ……..A purchaser can claim for the loss of a bargain, i.e the amount by which the net value of the property when conveyed to him at the due date would have exceeded the purchase price. But the court may order such damages to be assessed at some other date where justice so requires; this may be the date of the hearing if the property has risen in value meanwhile. Where the purchaser claims damages for his loss of bargain he cannot in addition recover his costs, e.g. for investigation of title. If he is to be placed in the position in which he would have been had the contract been performed, he would necessarily have incurred those costs.” [Emphasis added] 49. Further in the case of Millicent Perpetua Atieno Wandiga & Another vs John Chege [2013] eKLR, Nyamwea J (as she then was) stated that the principles governing the loss that is recoverable and the measure of damages upon breach by a seller of land are stated in Halsbury’s Laws of England, Volume 12, 4th Edition at paragraph 1183 as follows: “ .. .Where it is the vendor who wrongfully refuses to complete, the measure of damages is, similarly, the loss incurred by the purchaser as the natural and direct result of the repudiation of the contract by the vendor. These damages include the return of any deposit paid by the purchaser with interest, together with expenses which he has incurred in investigating title, and other expenses within the contemplation of the parties, and also, where there is evidence that the value of the property at the date of repudiation was greater than the agreed purchase price, damages for loss of bargain....” 50. The learned Judge further stated that ….’’the only outstanding loss that needs to be assessed is the loss of bargain, and the normal measure of damages for loss of bargain is the market value of the property at the time of repudiation less the contract price. 51. Having found that the plainti was the party in breach of the sale agreements, he would not be entitled to the reliefs sought and especially so for loss of bargain. What loss did the plainti suer? In any event, the plainti was refunded his deposit as demanded and he lost no ‘investment’ on the said monies. https://new.kenyalaw.org/akn/ke/judgment/keelc/2022/15034/eng@2022-11-24 7

page 7 of 8

Awarding the plainti loss of bargain would amount to unjustly enriching him which is contrary to public policy. A man shall only reap what he sows. 52. In regard to the claim for interest, he plainti states that although he was refunded his money, he was not satised. He therefore claims for loss of interest of Ksh 2,378,941 being the interest he would have earned if he had deposited the money in a xed deposit account. 53. As held in the rst issue above, the plainti is to blame for the repudiation of the agreements for sale. Further, the plainti is to blame for the delay in refunding the deposit as he failed to give the defendant his bank account details as requested. 54. Secondly, this claim was a specic claim and the plainti was obligated to specically prove it. He did not. It is not based on the terms and conditions of the contract between the parties. 55. Consequently, the plaintis’ case is dismissed in its entirety with costs to the defendant. It is so ordered. DATED, SIGNED AND DELIVERED AT NAIROBI THIS 24TH DAY OF NOVEMBER, 2022. M.D. MWANGI JUDGE In the virtual presence of: Mr. Kinyanjui h/b for Mahugu for the Defendant. No appearance for the plainti. Court Assistant – Hilda/Yvette M.D. MWANGI JUDGE ELC CASE NO 184 OF 2013 JUDGMENT 0 https://new.kenyalaw.org/akn/ke/judgment/keelc/2022/15034/eng@2022-11-24 8

page 8 of 8

A note on accuracy. These pages are generated automatically from our AI-written case briefs and have not been checked by a lawyer. Case titles and citations come from Kenya Law; the counts, topics, propositions and “treatment” labels are derived from the briefs and can be incomplete or wrong. Use them as a research aid and always read the original judgment before relying on anything here. This is not legal advice.