CORPORATE INSURANCE CO. LTD v NYALI BEACH HOTEL LTD [1998] KECA 30 (KLR)

Court of Appeal of Kenya
9 January 1998
3,636 words in judgment
View original judgmentRead on Kenya Law Watch case
AI-assisted case brief
·~15 min to read original · ~4 min brief

The bottom line

#

Kenya's Court of Appeal confirmed that a performance bond guarantor must prove the contract was fully performed, and vague defences will not stop summary judgment.

What this practically means

#

Executive summary

#
The Court of Appeal (Pall JA) dismissed the appeal by Corporate Insurance Co. Ltd against summary judgment entered by Githinji J in favour of Nyali Beach Hotel Ltd for Kshs.1,946,000 under a performance bond issued for Actaf Construction Ltd, the contractor engaged to build a new hotel wing. The contractor failed to complete, the contract was determined, an architect's certificate of Kshs.3,040,255.90 was converted into a consent arbitration award against the contractor (then in liquidation), and the Hotel sued the surety for the bond sum. The appellant argued the Hotel had to prove non-performance, had failed to disclose material facts, had extended time and breached the retention clause without the surety's consent, and had colluded with the liquidator in the arbitration. The court held the bond was conditioned to be void only upon full performance, so the onus of proving performance lay on the surety, and the unchallenged architect's certificate supported the claim. Citing Seaton v Heath and kindred authorities, the court held ordinary guarantees do not demand utmost good faith from the creditor; the duty of disclosure arises at formation and the surety must inquire rather than presume. The extension of time was granted by the architects under the principal contract and could only benefit the surety, while the bond's proviso preserved liability notwithstanding breaches. The collusion allegation was bland and unsupported. On summary judgment, the defendant must show a bona fide, reasonably arguable defence with particulars, and the appellate court would not disturb the judge's discretion absent error in principle or perversity. The appeal was dismissed with costs.

Questions the Court framed

#

The issues the Court set itself to decide, in its own words.

  1. 1.Whether the Hotel was required to prove non-performance of the construction contract before obtaining summary judgment on the bond
  2. 2.Whether the Hotel owed the appellant surety a duty to disclose the contractor's failure to perform
  3. 3.Whether the extension of time for completion discharged the appellant's liability under the bond
  4. 4.Whether non-compliance with the retention clause discharged the surety
  5. 5.Whether alleged collusion between the liquidator and the Hotel in the arbitration raised a triable issue
  6. 6.Whether the trial judge erred in entering summary judgment under Order 35

Key legal issues

#
01

Burden of proof on non-performance of the bonded contract

Holding

The onus lay on the appellant surety to prove full performance; the Hotel's claim was supported by the architect's certificate which the appellant did not impugn.

Reasoning

The bond was conditioned to be void only if the contractor fully conformed to the contract; in any other event it remained in force. The Hotel's director deponed to non-performance and annexed a detailed 22-page architect's certificate. The appellant made no attempt to show the certificate was faulty, so no triable issue on quantum or liability arose.

p. 3
02

Duty of disclosure by creditor to surety

Holding

No duty lay on the Hotel to notify the surety of the contractor's failures; the duty of disclosure arises at formation of the guarantee, and the alleged non-disclosure here related to later events.

Reasoning

The very object of the bond was to assure the Hotel of performance. The appellant was not misled at formation. Authorities (Seaton v Heath; Kiby v Duke of Marlborough; O'Hara v Allied Irish Banks; Trade Indemnity) show the surety must inquire rather than presume, and a creditor with whom the surety has no direct bargaining owes no duty of care.

p. 4
03

Effect of extension of time on the surety's liability

Holding

The extension was granted by the architects under the contract which was the basis of the bond, and the bond expressly preserved liability notwithstanding breaches; the defence failed.

Reasoning

Hudson's authority that an extension releases the surety is subject to extensions made under the provisions of the principal contract, which applied here. The bond's proviso discharged liability for no breach 'with or without the knowledge or consent' of the contractor. Further, an extension could only benefit the surety by enabling completion.

p. 5
04

Alleged collusion between liquidator and Hotel in the arbitration

Holding

The allegation was bland and unsupported by any prima facie evidence; the liquidator was the contractor's agent and there was no evidence of bad faith.

Reasoning

While an award against the principal debtor does not bind the surety, whose liability must be proved independently, on summary judgment the defendant must show a bona fide defence. The appellant could not use leave to defend as a fishing expedition to gather evidence of collusion at trial.

p. 5
05

Test for leave to defend on summary judgment

Holding

The defendant must condescend upon particulars and show a reasonable or fairly arguable defence; allegations are investigated and leave refused where the point is unarguable.

Reasoning

Order 35 enables a plaintiff to obtain judgment without trial where the claim is clearly proved and no bona fide defence is raised. The court investigates the allegations and may reject prima facie issues as unfit for trial without shutting out genuine defences. The trial judge's discretion was not exercised wrongly in principle or perversely.

p. 6

Legal principles established

#
  • On a performance bond conditioned to be void only upon full performance, the surety bears the onus of proving full performance; the creditor need not prove non-performance.
  • Ordinary contracts of guarantee do not require utmost good faith by the creditor towards the surety; mere non-communication of facts affecting the risk does not vitiate the guarantee.
  • An extension of time granted under the provisions of the principal contract does not release the surety, particularly where the bond expressly preserves liability notwithstanding breaches.
  • On summary judgment under Order 35, the defendant must show a bona fide and reasonably arguable defence with sufficient particulars; mere allegations or an intention to call expert evidence at trial are insufficient.
  • An appellate court will not interfere with a judge's discretion on summary judgment unless it was exercised wrongly in principle or perversely.

Court orders

#
  1. 1.Appeal dismissed with costs

The bench

#

One judgment of the whole court — no separate or dissenting opinions.

majority

Wrote the judgment

On appeal from
High Court of Kenya
H.C.C.C. No. 5123 of 1990
Jurisdiction invoked
First appeal to the Court of Appeal under the Civil Procedure Rules/statute (not expressly stated in the judgment)

Relief refused

#

Leave to defend the suit / setting aside of summary judgment

The appellant failed to show a bona fide or genuinely arguable defence; the alleged non-disclosure, extension of time, retention and collusion defences were negatived by the bond's terms or unsupported by evidence

p. 6

Costs

Appeal dismissed with costs to the respondent (the Hotel).

Quotable passages

#

Verbatim from the judgment, each located to the page it appears on in the official PDF — so these can be cited and checked directly.

Thus unless there is evidence that the contract had been fully performed by the contractor, the appellant continues to be bound by the bond.
p. 3Onus on surety to prove performance
Ordinary contracts of guarantee are not amongst those requiring uberima fides on the part of the creditor towards the surety and mere non communication to the surety by the creditor of the facts known to him affecting the risk undertaken by the surety will not vitiate the contract.
p. 4No duty of utmost good faith owed by creditor to surety
The defendant is bound to show that he has some reasonable or fairly arguable ground of defence to the action.
p. 6Summary judgment - leave to defend test
I would dismiss the appeal with costs.
p. 6Disposition

Issues in the judgment

#
minor

The judgment text contains typographical errors in quoted authority names and citations (e.g. 'Kiby vs. Duke of Marlborough', 'uberima fides', '0.353 r2'), reproduced here verbatim as printed.

Key timeline

#

Practical implications

#

Frequently asked questions

#

Cite this brief

#

Cite this brief

Caselaw, "CORPORATE INSURANCE CO. LTD v NYALI BEACH HOTEL LTD [1998] KECA 30 (KLR)", Case Analysis (1998). Civil Appeal 270 of 1996. Source: https://new.kenyalaw.org/akn/ke/judgment/keca/1998/30/eng@1998-01-09

Suggested citation format for research notes or client memos. Always verify the original judgment before relying on any point.